Careers

 Info Index

 About Us

 Contact Us

 Home 

  

>>> Advanced Search

 US Navy Today  About the Navy  Navy Leadership  Media Resources  Links of Interest  Information Index
  Senior Chief Quartermaster Perry Everix plots the ship's course aboard the ircraft carrier USS George H.W. Bush (CVN 77) as the ship makes her way out of port for Builder's Sea Trials.
Official U.S. Navy file photo.
View Larger Download HiRes
 

Navy's Newest Carrier Successfully Completes Acceptance Sea Trials
Story Number: NNS090409-10
Release Date: 4/9/2009 3:41:00 PM
Top News Story - Editors should consider using these stories first in local publications.

By Program Executive Office Carriers

WASHINGTON (NNS) -- USS George H.W. Bush (CVN 77) successfully completed acceptance sea trials April 7-9 off the Virginia Capes and is in final preparation for delivery. Acceptance sea trials are the final test of the ship's readiness to begin fleet service.

Navy representatives from the U.S. Navy Board of Inspection and Survey tested and evaluated the ship's systems and performance. Acceptance trials will formally conclude April 10.

George H.W. Bush is the nation's 10th, and final, Nimitz-class carrier. The ship is designed to carry all current and future aircraft in her embarked air wing until the completion of her service life in approximately 2059.

George H. W. Bush incorporates numerous design improvements to reduce operating cost, enhance operational effectiveness and protect the environment. These include newly designed propellers, a new underwater hull-coating system, advanced waste disposal systems, a new JP-5 (jet propellant) distribution system, and modernized aircraft launch and recovery equipment. Improved medical and dental facilities have been included in the ship to enhance quality of life. George H.W. Bush also has a new composite mast that reduces topside weight and maintenance.

George H.W. Bush incorporates a modernized island, bulbous bow design and three-wire arresting gear configuration, first introduced on USS Ronald Reagan (CVN 76).

The ship's keel was laid Sept. 6, 2003, at Northrop Grumman Shipbuilding-Newport News. Dorothy Bush Koch, daughter of former President George H.W. Bush, served as the ship's sponsor during its christening on Oct. 7, 2006. The ship was commissioned Jan. 10, 2009, at Norfolk Naval Base. USS George H.W. Bush is commanded by Capt. DeWolfe H. Miller III. Upon delivery to the Navy, the ship will conduct post delivery maintenance before commencing training for operational deployment in 2010.

For more news from Naval Sea Systems Command, visit www.navy.mil/local/navsea/.

E-mail this story to a friend | Send a comment about this story

Related Stories:
Former President Bush Visits Namesake Aircraft Carrier - 5/27/2009 High Interest Story This Story has a Photo
Navy Takes Delivery of Aircraft Carrier George H.W. Bush - 5/11/2009 High Interest Story This Story has a Photo
Former President George H.W. Bush's Shipmates Gather For Commissioning of Navy's Newest Carrier - 1/12/2009
Navy Commissions Final Nimitz-class Carrier, USS George H.W. Bush  - 1/10/2009 High Interest Story This Story has a Photo
Former President George H.W. Bush Tours Namesake Aircraft Carrier - 1/8/2009 High Interest Story This Story has a Photo


MS Word Friendly

Print Friendly


Subscribe NavNews

Submit Story/Photos

Tools

Contact Us

Privacy & Security

About This Site

External Links

Home



<a href="" class="menudark">All Hands PDF Version</a>